Software · $497/month

MD Price Engine

A commercial epoxy job pricing calculator for paid seats. The public page shows one frozen sample bid so you can see the product. It is not a live bid and it is not your job.

Primary checkout: $497/month on Whop.Whop checkout is linked.This is software, not the $99/month education membership.

What subscribers get

Price the job you will actually install.

  • Square footage, system/coats, prep, moisture, and access.
  • Crew size, loaded wage, mobilization, material, waste, contingency, target margin.
  • Recommended bid, $/sf, GP, break-even, max labor hours, extra-day cost, margin-risk flag.
  • Proposal-ready line items with print and text export — after you subscribe.

What it is not

  • Not a public live bid tool. The preview below does not recompute.
  • Not How to Grow and Sell Your Epoxy Business. That membership teaches the operating system.
  • Not Bid Desk. Reviews of live commercial bids are a separate $997/month desk.
  • Not a guarantee of the number you should send, the hours you will spend, or the margin you will keep.

Public preview

One frozen sample bid

Preview only. Not a live bid. Not your job. Subscribe to type your own numbers.

Frozen preview inputs

Square footage
8,000 sf
Coating system / coats
Single broadcast — flintshot, epoxy grout coat, urethane topcoat
Prep condition
Moderate — grind + patch
Moisture / contamination risk
Moderate — unknown or aged slab
Access / hours
Standard weekday hours
Crew size
4
Loaded wage / burden
$48.00 / person-hour
Travel / mobilization
$1,200.00
Material cost
$2.15 / sf before waste
Waste
8%
Contingency
6%
Target margin
32%
Production day
8 hours

Every rate above is a labeled teaching default, not an MD Industrial Services job file, crew rate, or vendor quote.

Sample result — not a live bid

Recommended bid

$40,944.93

Watch — margin at risk

Revenue / sf
$5.12
Material / sf
$2.51
Labor / sf
$0.63
Estimated GP
$13,102.38
Estimated margin
32.0%
Break-even
$27,842.55
Max labor hours
104.26 person-hours
One extra production day
$1,536.00

Estimated duration: 3 full production days on site (prep + broadcast, grout coat, urethane topcoat).

  • Moderate — unknown or aged slab increases hours and material in this model.

Sample line items

ItemAmountNote
Install labor (person-hours × loaded wage)$5,004.48104.26 person-hours
Materials including waste factor$20,062.088% waste · moisture material factor 1.08
Travel / mobilization (lump sum)$1,200.00
Contingency (6%)$1,575.99
Total estimated cost (break-even)$27,842.55
Target profit at 32% margin$13,102.38
Recommended bid (sample)$40,944.93

Need a human on the bid?

MD Bid Desk is $997/month and includes Price Engine plus 4 commercial bid reviews per month.

Subscribe to MD Bid Desk — $997/month

Still learning the craft?

The $99/month membership is the curriculum, workshop, and community. Do not skip it because you opened a calculator preview.

Join the founding membership — $99/month

Already subscribe to Price Engine or Bid Desk?Sign in with Whopto open the live calculator at /price-engine/app.